
Choose a first order before building
Use the order board to check what the customer wants and when it is due. A raw-fish order gives you a reason to build a direct line to loading. Save floor space for a processing station if a later order needs one.
Build and staff the first conveyor line
In the documented demo controls, left-click a cat and right-click the workstation you want it to operate. Staff both fishing and loading. Drag the conveyor from the construction menu and let the cat assigned to construction build the planned equipment. Watch the line run once before extending it.
Give your crew time to eat and rest
Leave room for the crew to rest and eat as you add equipment. The demo shows that breaks can be scheduled, and the developer highlights mood, working conditions, and wages. If deliveries slow down, check the station assignments and the crew before rebuilding the line.