
Connect fishing to the next destination
For raw fish, route the belt toward loading. If the order needs processing, send the fish to that station first, then route the output toward shipping. A splitter can direct items to different destinations when your orders call for more than one output.
Watch the handoff between a belt and a station
Check that each belt segment carries the fish toward the next station or belt. Watch the first fish and identify the last place it reaches if it stalls. Inspect that connection and check whether a worker is available at the receiving station before rebuilding the route.
Route around a blocked stretch of water
An early player report describes a direct conveyor route blocked by water. Check whether the current map offers connected floor around that gap. Use the campaign map’s layout and the current order to decide where to place the equipment on that route.