
Build the direct route for raw fish
Set out the fishing and loading stations first so you can see the space between their ports. In the illustrated demo, you choose a conveyor in the construction menu and drag the planned route. The green arrows indicate where the fish will travel once the belt is built.
Add processing only when the order needs it
A splitter can divide the flow when you need to ship raw fish and process another product. Give the processing station space for both its incoming and outgoing connections. Rotation and mirroring can help fit those connections along the edge of a crowded floor plan.
Check where a delivery actually stops
Watch the first fish all the way to loading. If the run stalls, look at the exact transfer point and check the direction and alignment there. Check both sides of a splitter before changing the rest of the line. Leave the stations accessible to the cats who operate them.